Introduction
About Sanima Mai Hydropower Ltd
Sanima Mai Hydropower Limited (SMHL) is a public limited company which was established as a special purpose vehicle company in 2065 for the development and operation of 22 MW Mai hydropower project (MHP) and 7 MW Mai Cascade hydropower project (MCHP). MHP generates 22 MW by utilizes around 23 cusec water of Mai river and MCHP generates 7 MW by using water released from tailrace of MHP. Both the projects operated by SMHL is located in Mai municipality, Ilaam. SMHL was converted to public limited company from 2068-12-3 and the company is coded as SHPC in Nepal Stock Exchange. Commercial operation of MHP and MCHP was achieved in 14 Fagun 2071 and 29 Magh 2072 respectively. SMHL is considered as one of the best hydropower company of Nepal and has its investment in different hydropower projects being developed by Sanima Hydro group.
Mai Hydropower Project
Mai Hydropower Project is a run-of-the-river hydropower plant with an installed capacity of 22MW. Located in Mai Muncipality (formerly Gunumune and Chisapani VDC), Ilam district, its construction began in 2010 and the plant became operational in 26th Feburary, 2015.
The average annual energy generation of Mai Hydropower Station is 128.298 GWh.
Mai Cascade Hydropower Project
Mai Cascade Hydropower Project is a run-of-the-river hydropower plant that utilizes the tail water of Mai Hydropower Station. With an installed capacity of 7 MW, it is situated in Mai Muncipality (formerly Danbari VDC), Ilam District. The construction of the plant began in 2013 and the plant became commercially operational in 12th Feburary, 2016. The average annual energy generation of Mai Cascade Hydropower plant is 38.422 GWh.
History
Mai Hydropower Project (MHP) was first proposed as a potential project in June 2006. After a feasibility study of the MHP was conducted by Sanima Hydropower Ltd, MHP was proposed as a peaking run-of-the-river hydropower project with an installed capacity of 22MW. But, under the advisement of the NEA, the Power Purchase Agreement (PPA) for MHP was signed on 21st April, 2010, with the peaking option abandoned and the installed capacity reduced to 15.6 MW. The PPA for MHP was later amended on 21st March 2012 and the installed capacity increased again to 22 MW. Another PPA for Mai Cascade Hydropower Project (MCHP) was signed on 25th January, 2013. A special purpose vehicle company, ‘Sanima Mai Hydropower Limited’ (SMHPL), was then established for the implementation of MHP (22MW) as well as Mai Cascade Hydropower Project (MCHP) (7MW). After the inception of SMHPL, Sanima Hydropower Limited made an application to the Department of Electricity Development (DoED) for a transfer of its license to SMHPL. The motion was approved by the DoED and SMHPL officially obtained its license on March 2009. The total duration of the completion of the projects, including testing and commissioning, was estimated to be 42 months and was presented as 4 years from the date of PPA.
The construction of MHP and MHCP began on January 2011 and July 2013, respectively. MHP became commercially operational on 26th February, 2015. MCHP became commercially operational on 12th February 2016. The total cost of both projects amounted to NPR 4,673 Million (approx. USD 45 Million).